SEI Engineers, Inc. undertook the job of creating a solution for moving coal from a new slope location to the existing preparation plant. The solution was to build two complexes with a dedicated rail from one complex to another. SEI provides all the detail engineering and construction management services from the initial study to start up and commissioning. |
|
Coal Expertise |
|
News |
|
Employment |
|
Preparation Plant Complex ■ Rail Receiving ■ Four Raw Coal Stockpiles ■ Ash Analyzer Determined which Pile to Place Coal ■ Preparation Plant Process Raw Coal ■ Two Clean Coal Stockpiles ■ Raw and Clean Coal Reclaimed and Blended Automatically ■ Blended Coal Loaded onto Unit Train |
|
Slope Belt Complex ■ 2,793 Foot Long Slope Tunnel ■ Services Two Coal Seams being Mixed ■ Two Slope Belts, 2500 TPH & 1500 TPH ■ Two 57,800 Ton Capacity Raw Coal Stockpiles ■ Coal is Reclaimed at 1500 TPH to the Breaker Building ■ Drive Through Rail Loadout Silo Loads Shuttle Train at 10,000 TPH |