SEI Engineers, Inc. undertook the job of creating a solution for moving coal from a new slope location to the existing preparation plant.  The solution was to build two complexes with a dedicated rail from one complex to another.  SEI provides all the detail engineering and construction management services from the initial study to start up and commissioning.

Coal Expertise

News

Employment

Preparation Plant Complex

 Rail Receiving

 Four Raw Coal Stockpiles

 Ash Analyzer Determined which Pile to Place Coal

 Preparation Plant Process Raw Coal

 Two Clean Coal Stockpiles

 Raw and Clean Coal Reclaimed and Blended Automatically

 Blended Coal Loaded onto Unit Train

Slope Belt Complex

 2,793 Foot Long Slope Tunnel

 Services Two Coal Seams being Mixed

 Two Slope Belts, 2500 TPH & 1500 TPH

 Two 57,800 Ton Capacity Raw Coal Stockpiles

 Coal is Reclaimed at 1500 TPH to the Breaker Building

 Drive Through Rail Loadout Silo Loads Shuttle Train at 10,000 TPH